How long does screed take to dry before the heating can be used?
This depends on the screed type:
- Traditional screed: around 1 day per mm up to 40mm, then slower drying - Liquid screed: typically faster, but still requires controlled drying
Underfloor heating must be commissioned gradually after curing to prevent cracking. We manage this process correctly to protect your floor and system.