Solar panels can reduce the amount of electricity imported from the grid. Eligible small-scale generators may also receive payment for measured electricity exported under a Smart Export Guarantee tariff. The value depends on actual export, the supplier’s current rate and its tariff conditions.
In this article, we’ll tell you all about the SEG scheme, including how you can apply and the eligibility criteria you need to meet. We’ll also tell you how much you can earn from the scheme per year, depending on how much electricity you produce.
What is the Smart Export Guarantee?
The Smart Export Guarantee is a regulatory framework requiring qualifying licensed electricity suppliers to offer at least one tariff that pays eligible small-scale generators for electricity exported to the grid. The scheme pays out for every unit of energy that you feed to the grid from your solar PV system. It doesn’t pay you for any electricity that you use yourself.
If you’re a part of the SEG scheme, you won’t be parting with any electricity that you actually need to use. It’s only the excess that gets exported back to the grid, rather than being wasted if you don’t have a battery storage option.
Mandatory SEG licensees and some voluntary suppliers offer export tariffs. The supplier does not need to be the company that sells electricity to your property, and suppliers are not described as MCS certified. MCS certification or an accepted equivalent normally relates to the generation installation and evidence used for eligibility.
How Do You Apply for Smart Export Guarantee?
The application process varies by supplier. Applicants should check the required generation certification, export-meter arrangements, identity and account evidence before choosing a tariff.
Solar PV panels
Onshore wind turbines
Micro-combined heat and power (Micro-CHP)
Hydro
Anaerobic digestion
Other Eligibility Requirements
An export meter capable of recording export readings, with the supplier able to obtain the required readings
Evidence that the generation installation meets the supplier’s certification requirements, commonly through MCS or an accepted equivalent
A system no larger than 5MW (Micro-CHP systems are limited to 50kW)
A connection to the relevant electricity distribution network
To apply for the SEG scheme, you need to get in contact with an SEG tariff supplier. They don’t need to be the same supplier that provides your energy, so you can shop around for the best deal. Each tariff supplier will offer a different rate, and it’s up to you to ensure you’re on a competitive deal.
:quality(70))
How Much Does the Smart Export Guarantee Pay?
SEG suppliers set their own tariff rate, contract length and conditions. A compliant rate must be above zero, but market offers can change and may depend on your import tariff, equipment or supplier relationship. Compare current tariffs directly and use the table below only to understand how different example rates affect potential income.
| Tariff | 250kWh exported (per year) | 500kWh exported (per year) | 750kWh exported (per year) | 1000kWh exported (per year) |
|---|---|---|---|---|
| 1p | £2.50 | £5 | £7.50 | £10.00 |
| 3p | £7.50 | £15 | £22.50 | £30.00 |
| 7p | £17.50 | £35 | £52.50 | £70.00 |
| 11p | £27.50 | £55 | £82.50 | £110.00 |
| 15p | £37.50 | £75 | £112.50 | £150.00 |
On a small screen, swipe across the table to see every column.
There are a lot of variables that can influence how much you get paid from the SEG. If you work from home, you’ll likely receive less as you’ll be using more of the electricity you generate. If you’re out for most of the day, your solar panels will produce a greater excess, resulting in a higher fee.
The weather also plays an important role. Summertime presents your greatest earning potential, as the days are longer and generally brighter. If the UK experiences a wet summer, which is well within the realms of possibility, your solar excess will be reduced.
How to compare SEG tariffs
The highest advertised unit rate is not always the best fit. Some tariffs require the same supplier for imported electricity, particular equipment, remote meter readings or a fixed contract period.
Export rate and whether it is fixed or variable
Eligibility and certification requirements
Meter-reading and half-hourly data requirements
Import-tariff, equipment or supplier restrictions
Contract length, exit terms and payment schedule